(3) On the plate connected to the best from the cylinder or lasting section thereof: adequate space need to be left around the plate to provide for stamping at least 6 retest dates: the plate has to be a minimum of one?sixteen inch thick and has to be hooked up by welding or by brazing in a temperature of at the very least 1100 °File, throughout a
situs bar178 - An Overview
(i) The remaining cylinders in Each and every whole lot need to be analyzed because of the evidence tension, drinking water-jacket, or immediate expansion take a look at technique as prescribed in CGA C-one. The minimum take a look at force has to be managed for the particular timeframe as well as testing machines have to be calibrated as prescribe